Skip to content

Fees and rates

Hourly rate and overhead factor calculator for architecture and engineering offices

Your break-even hourly rate is total office cost divided by the hours your staff spend on projects. The overhead factor is total office cost divided by the salary cost of those project hours. German architecture offices report a median factor of 2.2, and architecture and engineering offices together about 2.1. Enter your numbers below to get your rate and factor.

Last updated: 25 October 2026. By Vidas Vasiliauskas.

Calculator

All amounts are per year, in euros, without VAT. The values filled in describe an example office. They are not a benchmark. Results update as you type.

Project hours per person1,215
Total office cost€2,615,000
Overhead factor2.06
Break-even hourly rate€86.08
Hourly rate with profit€94.68

How the numbers are worked out

  1. Project hours per person = (working days minus days off) × weekly hours ÷ 5 × project share.
  2. Salary cost = project staff × gross salary × (1 + employer social security and other wage costs).
  3. Total office cost = salary cost + other office costs.
  4. Overhead factor = total office cost ÷ (salary cost × project share). This follows the definition in the German architects' chamber survey. It is the number you multiply project salary cost by to reach a rate that covers the whole office.
  5. Break-even hourly rate = total office cost ÷ project hours of all project staff.
  6. Hourly rate with profit = break-even rate × (1 + profit mark-up).

The two results describe the same thing. Take a person's yearly salary cost and divide it by their hours at work, then multiply by the factor. The result is the break-even rate.

Worked example: a 25-person engineering office

The calculator's example values, step by step.

StepInput or resultValue
Hours at work(252 days minus 35 days off) × 8 hours1,736 hours
Project hours70% of hours at work1,215 hours per person
Salary cost25 × €60,000 × 1.21€1,815,000
Total office costSalary cost + €800,000 other costs€2,615,000
Overhead factor€2,615,000 ÷ (€1,815,000 × 70%)2.06
Break-even rate€2,615,000 ÷ (25 × 1,215.2 hours)€86.08 per hour
Rate with profitBreak-even rate × 1.10€94.68 per hour

What German office surveys report

  • The Bundesarchitektenkammer Strukturbefragung 2024 (report year 2023) found that 23% of office owners know their overhead factor. In offices with 10 or more staff, 51% do.
  • The same survey puts the median factor at 2.2. It is 2.0 in offices under 5 staff and 2.3 in offices with 10 or more.
  • An IW Consult survey for AHO, BAK, VBI and BIngK (2025) found a factor of about 2.1 overall. Architecture and engineering offices differed only slightly.
  • In the same IW survey, offices said 76.5% of hours at work goes to project work on average.

The IW survey reports no factor for offices under 5 staff. Many of them left the owner's pay out of salary cost, which made the factor unrealistically high.

Where Teamhood fits

In Teamhood, each project's cost comes from the hours logged on it. You set hourly cost rates for the organization, a team or a person. Logged hours are priced at those rates, each item shows its cost, and a project shows its cost against its budget. A budget can be in hours or in money.

Planned hours count across every project, so you see who has time before you commit them. The price is €11 / $12 per user per month, billed yearly, excluding VAT. The first month is free, with no credit card. See all facts.

What Teamhood does not do

  • There is no mobile app. Teamhood runs in the browser, so hours are logged there.
  • The smallest subscription is 3 licenses.

Questions

What if my factor is well under 2?
A result well under 2 often means some costs are missing, such as admin salaries or the owners' pay.
How do I find my real project share?
Compare the project hours your staff logged over a year with their hours at work. A planning-office guide puts unproductive time at 30 to 35% in most offices, which leaves 65 to 70% for projects.
Is VAT included in the rate?
No. The calculator works without VAT. Add VAT on the invoice.

Sources

  1. Bundesarchitektenkammer: Strukturbefragung 2024, self-employed members. Share who know their factor, median factor, definition. Read 25 October 2026.
  2. IW Consult for AHO, BAK, VBI and BIngK: Mitgliederbefragung 2025. Factor by office type, project share, definition. Read 25 October 2026.
  3. PBP Planungsbüro professionell: Kalkulation im Planungsbüro (2021). Working days and unproductive time. Read 25 October 2026.
  4. Baunetz Wissen: Stundensätze. Rate as total office cost divided by project hours. Read 25 October 2026.
  5. Teamhood help: how budgets and cost are calculated and Teamhood facts. Cost rates, budgets, price and limits.