How to choose project management software for an engineering firm: a 6-step guide

Write down your must-haves before the first demo: a Gantt with dependencies, capacity across projects and time tracking per project. Price the plan that has all three at your team size. Test 2 or 3 tools on one real project. Read the exit terms before you sign.

Last updated: 2 November 2026. By Vidas Vasiliauskas.

The 6 steps

  1. Write down how your firm works
  2. Turn it into must-haves you can test
  3. Pick the type of tool
  4. Price the plan you need at your size
  5. Test 2 or 3 tools on a real project
  6. Check the contract and the exit

Disclosure: Teamhood makes project management software and wrote this guide. Other vendors’ prices and features come from their own pages, with the date we read them.

Why the process matters

Capterra asked 3,385 software buyers in 11 countries in August 2025. Only 34% had neither a disrupted rollout nor regret. In Germany the share was 29%.

The buyers who did well had habits in common. Most of them fixed their budget and must-have features first (62%). They kept a shortlist of about 3 vendors and chose in about 3 months.

1. Write down how your firm works

Answer these before you talk to any vendor. The answers decide which type of tool fits.

  • How many projects run at the same time, and on how many projects does one engineer work in a week.
  • How you price work: fixed fee per phase, hourly, or both.
  • Who outside the firm sees the plan: clients, subconsultants, authorities.
  • Where invoices are made today, and whether that stays.
  • Which systems must connect: accounting, HR for time off, file storage.
  • Where your plans live today: MS Project, Excel, an older tool.

2. Turn it into must-haves you can test

Most engineering firms end up with the list below. Each row has a test you can run in a free trial.

Must-haveWhy it mattersHow to test it
Gantt with dependencies and critical pathA late site survey moves the report and the submission date.Move one task by a week. Every dependent task and the end date must move with it.
BaselinesYou show the client what changed against the agreed plan.Save a baseline, move 3 tasks, compare the two versions.
Capacity across projectsEngineers work on several projects at once. A plan per project hides overbooking.Book one person on 3 projects in the same week. One view must show the total against their weekly hours and time off.
Time tracking per projectFee overruns show up in hours first.Log a week of hours. Compare estimated and tracked hours per phase.
A plan the client can readClients and authorities ask for the schedule.Export the Gantt to PDF and print it. Ask what access for a client costs.
Import of your current plansNobody wants to retype 40 projects.Import one real plan and check dates, dependencies and people.

Two benchmarks show why hours matter. Deltek’s 2026 study of 896 US and Canadian architecture and engineering firms reports utilization just under 60%. In a 2025 survey of about 2,500 German planning offices, about 84% made a profit, down from almost 97% a year earlier.

3. Pick the type of tool

Tools for engineering firms fall into 4 groups. Pick the group first, then compare tools inside it.

TypeExamplesCheck
Work managementmonday.com, Asana, ClickUp, Wrike, SmartsheetDependencies, capacity across projects and time tracking often start above the entry plan. See step 4.
SchedulingMicrosoft Planner and ProjectProject Online closed on 30 September 2026.
PSA (professional services automation)Deltek, BQE CORE, Scoro, ProductiveBQE CORE, Scoro and Productive include invoicing. BQE CORE and Deltek publish no price.
Project management with capacity planningCeloxis, TeamhoodCheck how hours reach your accounting tool: timesheet export or API.

If you need invoicing in the same tool, start with the PSA group. Our comparison of resource planning and profitability software covers 5 of these tools, plus Epicflow.

To compare named tools with prices, see our guides for engineering firms in Europe and for architecture firms.

If your projects mix fixed phases with agile sprints, see software for hybrid agile and waterfall projects.

4. Price the plan you need at your size

Price the cheapest plan that has a Gantt with dependencies, capacity across projects and time tracking. Some vendors call the capacity view “workload”. That plan is often not the entry plan.

ToolPlan you needPer user per monthPer year at 10 / 25 / 50 usersNote
monday.comPro€19€2,280 / €5,700 plus €360 for AI credits / quote onlySold up to 40 users online. Dependencies, workload and time tracking all start at Pro.
AsanaAdvanced€24.99€2,999 / €7,497 / €14,994The workload view covers one portfolio. Workload across the whole organization is on Enterprise.
WrikeBusiness$25$3,000 / $7,500 / $15,000Yearly billing only. Online purchase up to 15 users.
ClickUpBusiness$17$2,040 / $5,100 / $10,200Core ($9) has Gantt and time tracking, but the workload view is a trial there.
SmartsheetBusiness with Resource Management$19 plus add-on$2,280 / $5,700 / $11,400, plus the add-onTime tracking comes with the Resource Management add-on. Its price is not public.
Microsoft PlannerPlanner and Project Plan 3$30$3,600 / $9,000 / $18,000No timesheets in any Planner plan. Plan 3 adds baselines and critical path.
Zoho ProjectsEnterprise€9€1,080 / €2,700 / €5,400Workload across projects and critical path start at Enterprise.
ScoroProjects & Resources€25€3,000 / €7,500 / €15,000Minimum 5 users. The page does not say if €25 is the yearly or the monthly price.
CeloxisEssentials$25$3,000 / $7,500 / $15,000Minimum 5 users. The page also suggests Core ($10) with a $5 timesheet add-on. Its plan cards and table disagree.
ProductiveProfessional$25$3,000 / $7,500 / $15,000Minimum 3 users. Essential ($10) has no Gantt.
BQE CORE, DeltekNone listedQuote onlyQuote onlyNo public price.
TeamhoodOne plan€11 / $12€1,320 / €3,300 / €6,600One plan with every feature, plus Enterprise (SSO, SCIM, region choice), priced on request. Minimum 3 licenses.

List prices from each vendor’s pricing page and help center, read 19 October 2026, billed yearly, without VAT. Totals are price × users × 12 in the currency the page showed. Volume discounts are not included. monday.com Pro adds AI credits at €30 a month: at 10 users its page takes them off as a discount, at 25 users it charges them.

Also check what client access costs. monday.com has free viewers, Asana free guests and Wrike free viewers. Celoxis has a free client seat, but its client portal is on the Business plan ($45). In Teamhood, every active member holds a license, clients too.

5. Test 2 or 3 tools on a real project

Use one live project with 3 to 5 people for 2 weeks. A demo project hides the problems you will meet later. Integration problems are the most common rollout problem that leads to regret, says Capterra. In Germany, the most common causes of a disrupted rollout were integration problems (37%) and data migration (35%).

  1. Import the project plan you use today.
  2. Run the tests from step 2.
  3. Ask each person to log their hours for both weeks.
  4. Connect one system you use every day, for example your accounting or HR tool.
  5. Send the vendor a real support question and time the answer. In Germany, 28% of buyers who regretted a purchase named poor vendor support.
  6. Ask the people who will plan every day which tool they want. They will use it more than you.

We read 54 Reddit threads where engineers and architects discuss their tools, from 2023 to 2026 and mostly in the US. Upkeep came up more than any feature: 24 people said their tool needed too much upkeep. Another 19 said nobody kept it up to date. So test the upkeep in the trial: ask who updates the plan each week, and time how long it takes.

6. Check the contract and the exit

Successful buyers weigh the contract more than the sales pitch. In Capterra’s survey, 54% of them looked at contract terms and 26% at sales presentations.

Since 12 September 2025, the EU Data Act applies to cloud software, SaaS included. A provider must give you the switching terms in writing before you sign. Check that the contract states:

  • A notice period of at most 2 months to start a switch (Art. 25).
  • A transition period of 30 days, with the service still running (Art. 25).
  • At least 30 days to get your data back after that (Art. 25).
  • A full list of the data you can export (Art. 25).
  • Any early termination penalty. These are still allowed, but must be disclosed before you sign (Art. 29).

From 12 January 2027, providers cannot charge you for switching (Art. 29). For personal data, ask for the data processing agreement and the list of subprocessors. GDPR Art. 28 requires both, and says the provider returns or deletes your data when the contract ends.

Where Teamhood fits

Teamhood is project management software with Kanban, Gantt and timesheets, for teams that run many projects with the same people. The Gantt has dependencies, critical path and baselines. Capacity counts planned hours across every project, with time off. Gantt export to PDF is included. The app is in English.

Estimates and tracked hours add up from tasks to the project, and timesheets export. Teamhood is hosted in the EU on Microsoft Azure. You can take all your data out over the API while your subscription is active. When the contract ends, Teamhood returns your data or deletes it, as you choose. UAB Eylean signs a Data Processing Addendum that lists the subprocessors.

Roles and access per view limit what clients and contractors see. Our team moves your projects from your current tool at no extra cost. Moving the first project usually takes about one day of our work.

What Teamhood does not do

  • Teamhood cannot read an .mpp file. Save the plan as XML in MS Project first.
  • The MS Project import leaves out constraints, calendars, baselines, costs and custom fields.
  • Single sign-on (SSO), SCIM (automatic user setup from your directory) and a choice of region (EU, Germany or US) are on Enterprise only.

Questions

Will new software fix late projects?
Not on its own. In PMI’s 2026 Pulse of the Profession, 45% of above-average performers used a project management platform, against 44% of below-average performers. Agreement with the sponsor at the start showed a bigger gap: the two groups were 10 points apart on it.
Does the EU Data Act stop exit fees today?
Not fully. Until 12 January 2027 a provider may charge reduced switching fees, capped at its direct costs. Early termination penalties remain allowed if the contract discloses them. An EU proposal from November 2025 may change some of these rules. It was not law in October 2026.
Should we keep Excel next to the new tool?
For the 2-week trial, yes. After the switch, a second plan in Excel means two plans that disagree. Set a date when the old file becomes read-only.
Is this guide neutral?
No vendor guide is. We make Teamhood. If something is wrong, write to hello@teamhood.com and we fix it.

Sources

  1. Capterra 2026 Software Buying Trends and habit 1, habit 3. Survey of 3,385 buyers, August 2025. Read 19 October 2026.
  2. Capterra Germany, Softwareauswahl in Deutschland. 279 German buyers. Read 19 October 2026.
  3. Deltek Clarity 2026 study, press release. 896 US and Canadian firms. Read 19 October 2026.
  4. Ingenieurkammer-Bau NRW, Wirtschaftliche Lage 2025 (PDF). IW survey for AHO, BAK, VBI and BIngK. Read 19 October 2026.
  5. PMI Pulse of the Profession 2026 (PDF). Read 19 October 2026.
  6. EU Data Act, Regulation (EU) 2023/2854. Articles 23 to 29. Read 19 October 2026.
  7. GDPR, Regulation (EU) 2016/679. Article 28. Read 19 October 2026.
  8. monday.com pricing. Read 19 October 2026.
  9. monday.com dependencies (plans). Read 19 October 2026.
  10. Asana pricing. Read 19 October 2026.
  11. Asana workload (plans). Read 19 October 2026.
  12. Wrike pricing. Read 19 October 2026.
  13. ClickUp pricing. Read 19 October 2026.
  14. Smartsheet pricing. Read 19 October 2026.
  15. Microsoft Planner plans and pricing. Read 19 October 2026.
  16. Zoho Projects pricing. Read 19 October 2026.
  17. Scoro pricing. Read 19 October 2026.
  18. Celoxis pricing. Read 19 October 2026.
  19. Productive pricing. Read 19 October 2026.
  20. BQE CORE pricing. Read 19 October 2026.
  21. Teamhood pricing, Teamhood facts and What Teamhood does.